Equipment Replacement
Scheduled Maintenance Report for WMTU 91.9FM
Completed
The scheduled maintenance has been completed.
Posted Nov 25, 2020 - 13:21 EST
Verifying
Verification is currently underway for the maintenance items.
Posted Nov 25, 2020 - 13:17 EST
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Nov 25, 2020 - 11:00 EST
Scheduled
Between 11am and 2pm, we will be performing scheduled equipment replacement. During this time period, services may become briefly unavailable.
Posted Nov 25, 2020 - 05:52 EST
This scheduled maintenance affected: Web Services (WMTU Website, Keweenawesomefest Website, Forum, Archives, Docs), Core Network Services (Core Router, Core Switch, Storage Fiber Switch #1, Storage Fiber Switch #2, Office Switch, Audio Switch, Tower Switch, WMTU Edge Switch, GLRC Edge Switch), FM Broadcast (91.9 FM Broadcast, Emergency Alerts, Weather Alerts, RDS, Silence Detector), Scheduling & Automation (WideOrbit, MusicMaster, WMTU API), Virtual Servers (Web Services, Streaming & Archives Server, Atlassian Services, Database Server, Active Directory Services), Bare Metal Servers/Computers (Booth PC, Primary VM Host, Secondary VM Host, Storage Server, Backups Server), Web Streams (Icecast Live Stream, Twitch.tv, YouTube), Active Directory Services (Primary Domain Controller, Secondary Domain Controller, Self Service Portal), and FM Broadcast & Audio Control (Library Audio Engine, Remote Studio Broadcast, Axia AES Node (Booth), Axia AES Node (FM), FM Vorsis Processor FP, FM Vorsis Processor HW, Audio Delay Unit, Productions Engine, Productions Mic Control, Burk ARC Plus).